- Updated `PROJECT_STATUS.md` to reflect the implementation of F15 features, including the unified slot review and handling of `findings_stale`. - Enhanced `PROGRESSION_GRAPH_SLOT_EDITOR_SPEC.md` with detailed descriptions of new functionalities related to the match dialog and path quality assessments. - Introduced new functions in `exercise_progression_graphs.py` to validate exercise visibility against progression graph settings, ensuring proper governance. - Improved frontend components to support new governance parameters (visibility and club_id) in exercise creation workflows. - Updated documentation in `HANDOVER.md` and `PLANNING_KI_ROADMAP.md` to outline the latest developments and validation results for the F15 features. - Enhanced utility functions for exercise creation to incorporate governance settings, improving the overall user experience in the path builder and editor.
9.3 KiB
Planungs-KI — Produkt-Roadmap
Stand: 2026-05-22
App-Version: 0.8.233 — maßgeblich backend/version.py
Diese Roadmap ergänzt die Architektur-Refaktor-Roadmap (UMSETZUNGSPLAN_ROADMAP.md) und gilt nur für KI-gestützte Trainingsplanungsunterstützung.
Ist-Stand Progressionsgraph (detailliert): PLANNING_PROGRESSION_GRAPH_KI.md
Leit-Spec: .claude/docs/working/PLANNING_PROGRESSION_ROADMAP_SPEC.md
Strategische Entscheidung (verbindlich)
- Progressionsgraph: Planung vom Ziel rückwärts (Roadmap-first), nicht Bibliothek-first.
- Keine Gruppenanalyse im Graphen — Kontext = Zieltext, Katalog-Dimensionen, Start/Ziel, Roadmap, optional Graph-Kanten.
- Drei Schichten statt monolithischem Vokabular: Katalog (DB) · Technik-Disambiguierung (Code, nur bei Technik-Themen) · Didaktik (Roadmap + LLM-QS).
- Trainingsplanung (Einheit, Rahmen, Abschnitt): eigene Pipeline (Phase G), mit Gruppenkontext — siehe
AI_PLANNING_KI_MULTISTAGE_FORECAST.mdS0–S4 und Ist-Doku §16. - Orchestrierung: Workflow-lite jetzt (
planning_progression_roadmap.py,planning_exercise_path_builder.py); Mitai Workflow-Engine später, wenn Phase G stabil ist.
Phasen-Übersicht
| Phase | Domäne | Kurzbeschreibung | Status |
|---|---|---|---|
| P0–P2 | Übungssuche | Kontext-Pack, Hybrid-Score, LLM-Rerank | ✅ |
| A–C2 | Übungssuche | Voll-Library, Graph, Varianten | ✅ |
| C3 | Progressionsgraph | Pfad-Builder (retrieval-first) | ✅ |
| E–E3 | Progressionsgraph | Semantik, QA, Lücken-Angebote | ✅ |
| F0–F4 | Progressionsgraph | Roadmap-Pipeline, LLM, roadmap_first, UI Review | ✅ 0.8.204–209 |
| F5–F9 | Progressionsgraph | Start/Ziel, Gap-Prep, Skill-Expectations, Persistenz | ✅ 0.8.210–217 |
| F10 | Progressionsgraph | Stufen-Lernziel-Gate, kein blindes Rank-Fallback | ✅ 0.8.218 |
| F11–F12 | Progressionsgraph | Auto-Rematch, Spec-Refine, QS-Pipeline-Timing | ✅ 0.8.225–0.8.232 |
| F13–F14 | Progressionsgraph | Katalog-Kontext + GraphEditor-Workbench | ✅ 0.8.233 |
| D | Übungs-Neuanlage | planning_context an suggestExerciseAi |
✅ 0.8.208 |
| UX | Progressionsgraph | Wizard/Stepper; PathBuilder-Parität Katalog | 🔲 |
| D′ | Progressionsgraph | Auto KI-Gap-Fill bei persistent leeren Slots | 🔲 Backlog |
| G | Trainingsplanung | Kontext-Pack Gruppe/Historie, G0–G4 | 🔲 |
| H | Plattform | Technik-Katalog konfigurierbar; Mitai-Workflow | 🔲 Backlog |
Phase F — Progressions-Roadmap (abgeschlossen bis F14)
Details und Module: PLANNING_PROGRESSION_GRAPH_KI.md.
F0–F9 — (Kurz, siehe Ist-Doku)
- F0 Foundation (0.8.204) — Spec, Pipeline-Skeleton, Prompts 078
- F1 Deterministische Roadmap — Phase A/B/C heuristisch
- F2 LLM Roadmap (0.8.205) — Prompts 078/079
- F3 roadmap-first (0.8.206) — Match pro
stage_spec,roadmap_unfilled - F4 UI Review (0.8.207) —
roadmap_override, Major Steps editierbar - F5 Start/Ziel (0.8.210–214) — Prompt 087, Zwei-Schritt-UI
- F6 Gap-KI-Kontext (0.8.212–214) —
ExerciseGapFillPrepModal - F7 Fähigkeiten-Scoring (0.8.215–216) —
planning_skill_expectations - F8 Stufen-Details UI (0.8.216) — editierbare
stage_specs - F9 Persistenz (0.8.217) — Migration 088
planning_roadmapJSONB
F10 — Stufen-Qualität (0.8.218)
- Stufen-Lernziel-Gate — kein Rank-Fallback ohne Pass
- Anti-Pattern-Sanitizer,
stage_mismatch→ leerer Slot + Gap
F11 — Auto-Optimierung (0.8.225–0.8.230)
planning_path_rematch.py— Rematch-Schleife fürrematch_slot/roadmap_unfilledplanning_path_refine_stage.py— Spec-Schärfung aus QSplanning_path_qa_pipeline.py— mehrstufige QS
F12 — Pipeline-Timing & Sync (0.8.231–0.8.232)
- Post-Match-Gate vor Rematch-Akzeptanz
- LLM Pfad-QS nach Rematch
- Gap-Offers vor
path_qa-Summary - Frontend:
applyMatchStepsToSlotssync permajorStepIndex
F13 — Katalog-Kontext (0.8.233)
planning_catalog_context.py— Fokus, Stil, Trainingsstil, Zielgruppe- Merge in
PlanningTargetProfile+ Text-Signale - Persistenz im Graph-Artefakt
- Technik-Gates nur bei
topic_type == "technique"
F14 — GraphEditor Workbench (0.8.233)
ProgressionGraphEditor— primäre UI für Roadmap + Match + Lücken- Vier Planungskontext-Dropdowns im Editor
progressionGraphDraft.js— Artefakt + API-Payload
F15 — Match-Dialog & getrennte Pfad-QS (2026-05-22, lokal)
unified_slot_review— Dialog pro Slot (Bibliothek + KI, Stufen-Fit-Vergleich)- Vorauswahl: Bibliothek nur bei Stufen-Fit ≥ 50 %; sonst KI bei leerem/schwachem Slot
- Übernahme ohne teure Auto-Nach-Bewertung; manuell „Graph bewerten“
path_qa.roadmap_qa+path_qa.assignment_qa; Gesamt = Minimumfindings_staleim Graph-Artefakt — Hinweis „Bewertung veraltet“ (persistiert)- Slot-Key-Fix — Lernziel editierbar ohne Fokusverlust
Validierung (Referenz Mae Geri, 2026-05)
| Phase | Roadmap-QS | Besetzung | Gesamt | Ergebnis |
|---|---|---|---|---|
| Vor Roadmap/KI | — | — | ~65 % | Lücken, Off-Topic |
| Roadmap ok, Slots leer | ~88 % | ~8–15 % | ~8–15 % | Besetzung fehlt |
| Nach Match + Fill | ~88 % | hoch | ~85 %+ | Vollständige Abdeckung |
Fazit: Roadmap-QS und Besetzungs-QS getrennt betrachten; Workbench + Katalog + Roadmap universell.
UX — UI-Überarbeitung (offen)
- Wizard mit 4 Schritten (Ziel & Katalog → Roadmap → Match → Lücken)
- Progressive disclosure — Details in Panels
- PathBuilder-Parität: gleiche Katalog-Dropdowns wie GraphEditor
- QS-UI: positive LLM-Hinweise als Highlights
- Briefing:
PLANNING_PROGRESSION_GRAPH_KI.md§12
Phase D′ — Auto Gap-Fill (Backlog)
- Bei persistent
roadmap_unfilledautomatisch KI-Vorschlag vorbereiten (ohne manuelles Modal) - Governance: Trainer bestätigt vor Persistenz
Phase G — Trainingsplanung (komplexere Domäne)
Ziel: Einheiten, Rahmen-Slots, Abschnitte und parallele Streams KI-gestützt planen — ohne zweite Retrieval-Welt.
Wiederverwendung aus Progressionsgraph
| Baustein | Progressionsgraph | Trainingsplanung |
|---|---|---|
PlanningTargetProfile |
Curriculum-Query + Katalog | Einheit + Abschnitt + Slot + Katalog + Historie |
planning_catalog_context |
Am Graph gespeichert | Pro Einheit / Slot / Voreinstellung |
planning_skill_expectations |
progression_stage, progression_path |
training_section, framework_slot |
planning_exercise_retrieval |
Roadmap-Stufen-Match | suggest_planning_exercises — bereits produktiv |
planning_path_qa_pipeline |
Curriculum-QS | Abschnitts-QS (Kohärenz, Streams) |
planning_exercise_form_context |
Pfad-Lücken | Abschnitts-/Slot-Lücken |
| Roadmap-Pipeline | Major Steps über Wochen | Nicht 1:1 — Phasen/Streams + Vorlagen |
Was Phase G neu braucht
- Gruppen-/Historie-Kontext-Pack (
AI_PLANNING_KI_MULTISTAGE_FORECASTS0–S4) - Abschnitts-Didaktik — Dauer, Parallel-Streams, Coaching
- Rahmen-Blueprint-Anbindung (
training_framework_programs, Slot-Blueprints) - Eigene Orchestrierung pro Einheit (kein Curriculum über N Wochen)
Integrations-Reihenfolge G0–G4
| Schritt | Inhalt | Abhängigkeit |
|---|---|---|
| G0 | Katalog in Einheits-Editor → bestehende Suggest-Pipeline | F13 ✅ |
| G1 | Scope training_section + Skill-Erwartungen aktiv |
F7 ✅ |
| G2 | Abschnitts-QS (Hint-Struktur wie Graph) | F11–F12 ✅ |
| G3 | Framework-Slot + Gap-Fill | G0, G1 |
| G4 | Gruppenkontext-Pack | G0–G3 |
Nicht: Roadmap-first-Loop 1:1 auf Trainingseinheit mappen.
Details: PLANNING_PROGRESSION_GRAPH_KI.md §16 · Domäne DOMAIN_MODEL.md §1–2.
Phase H1 — Katalog-Prompt-Snippets (Spez geplant)
Spec: PLANNING_CATALOG_PROMPT_SNIPPETS.md
Modulare Textbausteine pro Katalog-Ausprägung in LLM-Prompts (Roadmap, Pfad-QS, Stufen-Spec) — nicht neue Retrieval-Welt.
Priorität (absteigend): Primärfokus → Trainingsstil → Zielgruppe → Stilrichtung.
planning_catalog_prompt_snippets.py+ Registry (5–8 Snippets)- Platzhalter
{{catalog_guidance_block}}in Pfad-QS + Roadmap-Prompts - Dev-Regression: Gewaltschutz / Breitensport / Kinder — QS-Hinweise passend zum Kontext
Phase H — Plattform (Backlog)
- Technik-Disambiguierung konfigurierbar (DB statt
_GERI_TECHNIQUESin Code) - Mitai Workflow-Engine — erst wenn G0–G4 stabil
Abhängigkeiten
| Von | Nach | Hinweis |
|---|---|---|
| F13 | G0, H1 | Katalog-Kontext in Einheitsplanung; Snippets in LLM-Prompts |
| F7, F11 | G1, G2 | Skill-Expectations + QS-Muster |
| F4, F9 | G3 | Graph-Roadmap kann Rahmen referenzieren |
| G | H | Workflow-Engine lohnt bei verzweigten Planungsflows |
Pflege
Bei Abschluss einer Teilphase: PLANNING_PROGRESSION_GRAPH_KI.md (Ist-Stand), diese Datei, HANDOVER.md §2.8, PLANNING_EXERCISE_SUGGEST_CONTEXT.md §24, Changelog in version.py.