- .gitignore: .claude/docs, rules, commands tracken; settings.local weiter ignorieren - DOCUMENTATION.md: verbindliche Ablage functional/technical/working/issues - .claude/README.md: Agent-Einstieg; GITEA_ISSUES_INDEX aus MCP (Stand 2026-04-08) - Arbeitspapiere von docs/ nach .claude/docs/working/ verschoben - docs/MEMBERSHIP_SYSTEM.md als Stub; kanonisch technical/MEMBERSHIP_SYSTEM.md - CLAUDE.md Pflichtlektüre und Links angepasst; docs/README.md vereinfacht Made-with: Cursor
4.0 KiB
Executive Reconciliation Summary
Generated: 2026-03-30 14:58:37 Scope: 111 Placeholders Data Sources: Export Catalog, Audit Reports (2026-03-29), Draft Document
Overview
This reconciliation consolidates data from three authoritative sources to create a single source of truth for all 111 placeholders.
Key Findings
- 71 placeholders (63%) are implemented in code
- 8 placeholders (7%) are fully compliant with normative requirements
- 22 placeholders (20%) are partially compliant
- 81 placeholders (73%) are non-compliant
Reconciliation Results
- Verified Match (7): Draft, Export, and Audit align perfectly
- Needs Sharpening (49): Correct but incomplete metadata
- Needs Refactor (16): Code-docs conflicts exist
- Draft Wrong (0): Draft specification incorrect
- New Required (39): Not implemented, needs build
- Unclear (0): Manual review needed
Priority Distribution
- P0 (Critical): 83 placeholders
- High usage (breaking change risk)
- Missing documentation (category/description)
- Unknown time window
- P1 (High): 10 placeholders
- Partially compliant with minor gaps
- P2 (Medium): 10 placeholders
- Non-compliant, needs work
- P3 (Low): 8 placeholders
- Compliant, maintenance only
Critical Issues
1. Known Code-Documentation Conflicts
weight_trend: Code uses 28d, docs say 7d/30d- Resolution: Update docs to match code (28d)
activity_summary: Code uses 14d, docs say 7d- Resolution: Update docs to match code (14d)
activity_detail: Time window unclear in code- Resolution: Needs code review to determine actual time window
2. High-Usage Placeholders (Breaking Change Risk)
name(19 uses, non_compliant)geschlecht(14 uses, non_compliant)height(12 uses, non_compliant)weight_aktuell(10 uses, compliant)weight_trend(10 uses, compliant)goal_bf_pct(10 uses, non_compliant)caliper_summary(8 uses, partially_compliant)circ_summary(8 uses, compliant)goal_weight(8 uses, non_compliant)protein_ziel_low(7 uses, non_compliant)protein_ziel_high(7 uses, non_compliant)activity_detail(4 uses, non_compliant)
3. Missing Documentation (P0)
49 placeholders lack category classification 49 placeholders lack descriptions
Recommendations
Immediate Actions (P0)
-
Resolve Known Conflicts (3 placeholders, 2-4 hours)
- Update documentation to match code implementation
- Validate time windows in code
-
Classify Time Windows (74 placeholders, 8-12 hours)
- Use name-based extraction for
*_7d,*_28dpatterns - Extract from code default parameters
- Manual classification for unclear cases
- Use name-based extraction for
-
Add Categories and Descriptions (49 placeholders, 4-6 hours)
- Bulk update from audit semantic analysis
- Use existing audit report classifications
Next Sprint (P1)
-
Add Confidence Logic (103 placeholders, 12-16 hours)
- Implement for trend/delta placeholders
- Add min-data thresholds
-
Document Data Layer Modules (100 placeholders, 6-8 hours)
- Trace resolver functions to data layer
- Document source tables
Later (P2-P3)
-
Integrate Unused Placeholders (67 placeholders)
- Create prompt use cases
- Plan integration timeline
-
Achieve Production Status (30+ placeholders)
- Reach 80%+ metadata completeness
- Complete all normative requirements
Conclusion
The reconciliation process successfully analyzed all 111 placeholders. While only 8 are currently fully compliant, the systematic gaps are primarily documentation-related rather than functional. With a structured remediation plan (estimated 82-110 hours), the system can reach
60% normative conformity within 4-6 weeks.
Next Steps:
- Review this summary with product/tech leads
- Prioritize P0 items for immediate action
- Begin systematic remediation following the implementation waves