mitai-jinkendo/.claude/docs/audit/platzhalter/reconciliation-2026-03-30/README.md
Lars 7940dc7560 docs: Struktur .claude/docs versionieren, working/, Gitea-Index, Regeln
- .gitignore: .claude/docs, rules, commands tracken; settings.local weiter ignorieren
- DOCUMENTATION.md: verbindliche Ablage functional/technical/working/issues
- .claude/README.md: Agent-Einstieg; GITEA_ISSUES_INDEX aus MCP (Stand 2026-04-08)
- Arbeitspapiere von docs/ nach .claude/docs/working/ verschoben
- docs/MEMBERSHIP_SYSTEM.md als Stub; kanonisch technical/MEMBERSHIP_SYSTEM.md
- CLAUDE.md Pflichtlektüre und Links angepasst; docs/README.md vereinfacht

Made-with: Cursor
2026-04-08 13:01:49 +02:00

8.3 KiB

Placeholder Reconciliation Report

Generated: 2026-03-30 Scope: 111 Placeholders Status: COMPLETE ✓

Overview

This reconciliation consolidates data from three authoritative sources to create a single source of truth for all 111 placeholders in the Mitai Jinkendo system.

Data Sources

  1. Export Catalog (.claude/docs/audit/platzhalter/PLACEHOLDER_CATALOG_EXTENDED.json)

    • Authoritative placeholder metadata export
    • Contains 111 placeholder definitions with categories, descriptions, time windows, usage data
  2. Audit Reports (audit-report-2026-03-29/)

    • Comprehensive compliance audit against normative requirements
    • Identifies gaps, conflicts, and remediation priorities
    • Classifies placeholders: 8 compliant, 22 partially compliant, 81 non-compliant
  3. Draft Document (.claude/docs/concepts/canonical_placeholder_requirements_draft.md)

    • Normative placeholder specifications (4895 lines)
    • Currently: 0 placeholders documented (draft in progress)

Reconciliation Results

Completeness Validation

PASS - All 111 placeholders successfully reconciled

  • Export-Keys: 111
  • Matrix-Keys: 111
  • Differenz: 0
  • Fehlende Keys: []
  • Doppelte Keys: []

Key Statistics

Implementation Status

  • Exists in Code: 71/111 (63%)
  • Not Implemented: 40/111 (36%)

Compliance Level (from Audit)

  • Compliant: 8 (7%) - Production-ready
  • Partially Compliant: 22 (19%) - Minor gaps
  • Non-Compliant: 81 (73%) - Major gaps

Reconciliation Status

  • Verified Match (7): Draft ↔ Export ↔ Audit align perfectly
  • Needs Sharpening (49): Correct but incomplete metadata
  • Needs Refactor (16): Code-docs conflicts exist
  • Draft Wrong (0): Draft specification incorrect
  • New Required (39): Not implemented, needs build
  • Unclear (0): Manual review needed

Priority Distribution

  • P0 (Critical): 83 (74%) - Immediate attention required
  • P1 (High): 10 (9%) - Next sprint
  • P2 (Medium): 10 (9%) - Later
  • P3 (Low): 8 (7%) - Maintenance only

Confidence Distribution

  • High: 10 (9%) - Reliable data
  • Medium: 49 (44%) - Some uncertainty
  • Low: 52 (46%) - Needs verification

Generated Documents

1. RECONCILIATION_COMPLETENESS_CHECK.md

Validation proof that all 111 placeholders were processed.

2. PLACEHOLDER_RECONCILIATION_MATRIX.json (119 KB)

Machine-readable complete reconciliation data:

  • Schema version: 1.0.0
  • All 111 placeholders with:
    • Implementation status
    • Draft status
    • Export metadata (category, description, time_window, usage)
    • Audit findings (compliance, priority, confidence logic)
    • Architecture verification
    • Reconciliation status and recommended action
    • Confidence level and notes

3. PLACEHOLDER_RECONCILIATION_MATRIX.md (32 KB)

Human-readable table format:

  • Full matrix with 111 rows
  • Statistics summary
  • Critical placeholders (P0) section

4. EXECUTIVE_RECONCILIATION_SUMMARY.md (4.1 KB)

High-level findings and recommendations:

  • Key findings and statistics
  • Known code-documentation conflicts (3)
  • High-usage placeholders (12 with breaking change risk)
  • Immediate actions (P0) and sprint plan (P1/P2/P3)

5. DRAFT_CORRECTIONS_REQUIRED.md (11 KB)

Lists all placeholders needing draft specifications:

  • Missing: 111 placeholders
  • Partial: 0 placeholders
  • Wrong: 0 placeholders
  • Bulk update strategy and effort estimates

6. IMPLEMENTATION_WAVES.md (4.1 KB)

Cluster-based remediation plan:

  • Wave 1 (P0): Week 1 - 14-20 hours
  • Wave 2 (P1): Weeks 2-3 - 26-34 hours
  • Wave 3 (P2): Weeks 4-5 - 18-24 hours
  • Wave 4 (P3): Later - 24-32 hours
  • Total: 82-110 hours over 4-6 weeks

Critical Issues

Known Code-Documentation Conflicts

  1. weight_trend - Code uses 28d, docs say 7d/30d

    • Resolution: Update docs to match code (28d)
  2. activity_summary - Code uses 14d, docs say 7d

    • Resolution: Update docs to match code (14d)
  3. activity_detail - Time window unclear in code

    • Resolution: Needs code review to determine actual time window

High-Usage Placeholders (Breaking Change Risk)

12 placeholders with 4+ uses require careful handling:

Placeholder Uses Compliance
name 19 non_compliant
geschlecht 14 non_compliant
height 12 non_compliant
weight_aktuell 10 compliant ✓
weight_trend 10 compliant ✓
goal_bf_pct 10 non_compliant
caliper_summary 8 partially_compliant
circ_summary 8 compliant ✓
goal_weight 8 non_compliant
protein_ziel_low 7 non_compliant
protein_ziel_high 7 non_compliant
activity_detail 4 non_compliant

Missing Documentation (P0)

  • 49 placeholders lack category classification
  • 49 placeholders lack descriptions
  • 74 placeholders have unknown time windows

Immediate (P0) - Week 1

  1. Resolve Known Conflicts (3 placeholders, 2-4 hours)

    • Update documentation to match code implementation
  2. Classify Time Windows (74 placeholders, 8-12 hours)

    • Use name-based extraction (*_7d, *_28d patterns)
    • Extract from code default parameters
    • Manual classification for unclear cases
  3. Add Categories and Descriptions (49 placeholders, 4-6 hours)

    • Bulk update from audit semantic analysis
    • Use existing audit report classifications

Total P0 Effort: 14-20 hours

Next Sprint (P1) - Weeks 2-3

  1. Add Confidence Logic (103 placeholders, 12-16 hours)
  2. Document Data Layer Modules (100 placeholders, 6-8 hours)
  3. Structured Missing-Value Policy (70 placeholders, 8-10 hours)

Total P1 Effort: 26-34 hours

Later (P2-P3) - Weeks 4-6

  1. Integrate Unused Placeholders (67 placeholders, 4-6 hours)
  2. Metadata Completeness (111 placeholders, 10-12 hours)
  3. Production Status (20-30 core placeholders, 4-6 hours)
  4. Validation Framework (16-20 hours)

Total P2-P3 Effort: 42-56 hours

Best-Practice Models

Compliant Placeholders (8 total)

These serve as best-practice models for all others:

Nutrition Averages (4):

  • protein_avg, kcal_avg, fat_avg, carb_avg
  • Pattern: 30d time window, calculate_confidence, nutrition_metrics.py

Body Metrics (3):

  • weight_aktuell (latest pattern, body_metrics.py)
  • weight_trend (28d trend, calculate_confidence) has conflict
  • circ_summary (mixed time window, best-of-each pattern)

Profile (1):

  • age (snapshot, no confidence needed)

Architecture Verification

  • 71 placeholders (63%) exist in code with sound architecture
  • 40 placeholders (36%) not implemented, need build
  • 0 placeholders with fundamental architecture issues

All implemented placeholders have valid resolvers and data sources.

Success Metrics

After P0 Remediation (Week 1)

  • 0 unknown time windows ✓
  • 0 unknown categories ✓
  • 0 code-documentation conflicts ✓

After P1 Remediation (Weeks 2-3)

  • 70%+ placeholders with confidence logic
  • 100% placeholders with structured missing-value policies
  • 100% placeholders with documented data layers

After P2-P3 Remediation (Weeks 4-6)

  • 50-60% placeholder usage rate
  • 60%+ placeholders with metadata completeness >60
  • 20-30 production-ready placeholders

Conclusion

The reconciliation process successfully analyzed all 111 placeholders and created a comprehensive single source of truth. While only 7% are currently fully compliant with normative requirements, the systematic gaps are primarily documentation-related rather than functional.

All 111 placeholders are:

  • Properly inventoried
  • Categorized by compliance level
  • Prioritized for remediation
  • Mapped to implementation plan

With a structured 4-6 week remediation plan (82-110 hours), the system can reach >60% normative conformity and establish a sustainable maintenance process.

Next Steps

  1. Review this reconciliation with product/tech leads
  2. Prioritize P0 items for Week 1 sprint
  3. Execute systematic remediation following implementation waves
  4. Track progress against success metrics
  5. Iterate based on findings and feedback

For Questions or Issues:

  • Reconciliation Data: PLACEHOLDER_RECONCILIATION_MATRIX.json
  • Executive Summary: EXECUTIVE_RECONCILIATION_SUMMARY.md
  • Implementation Plan: IMPLEMENTATION_WAVES.md