mitai-jinkendo/.claude/docs/audit/platzhalter/reconciliation-2026-03-30/EXECUTIVE_RECONCILIATION_SUMMARY.md
Lars 7940dc7560 docs: Struktur .claude/docs versionieren, working/, Gitea-Index, Regeln
- .gitignore: .claude/docs, rules, commands tracken; settings.local weiter ignorieren
- DOCUMENTATION.md: verbindliche Ablage functional/technical/working/issues
- .claude/README.md: Agent-Einstieg; GITEA_ISSUES_INDEX aus MCP (Stand 2026-04-08)
- Arbeitspapiere von docs/ nach .claude/docs/working/ verschoben
- docs/MEMBERSHIP_SYSTEM.md als Stub; kanonisch technical/MEMBERSHIP_SYSTEM.md
- CLAUDE.md Pflichtlektüre und Links angepasst; docs/README.md vereinfacht

Made-with: Cursor
2026-04-08 13:01:49 +02:00

4.0 KiB

Executive Reconciliation Summary

Generated: 2026-03-30 14:58:37 Scope: 111 Placeholders Data Sources: Export Catalog, Audit Reports (2026-03-29), Draft Document

Overview

This reconciliation consolidates data from three authoritative sources to create a single source of truth for all 111 placeholders.

Key Findings

  • 71 placeholders (63%) are implemented in code
  • 8 placeholders (7%) are fully compliant with normative requirements
  • 22 placeholders (20%) are partially compliant
  • 81 placeholders (73%) are non-compliant

Reconciliation Results

  • Verified Match (7): Draft, Export, and Audit align perfectly
  • Needs Sharpening (49): Correct but incomplete metadata
  • Needs Refactor (16): Code-docs conflicts exist
  • Draft Wrong (0): Draft specification incorrect
  • New Required (39): Not implemented, needs build
  • Unclear (0): Manual review needed

Priority Distribution

  • P0 (Critical): 83 placeholders
    • High usage (breaking change risk)
    • Missing documentation (category/description)
    • Unknown time window
  • P1 (High): 10 placeholders
    • Partially compliant with minor gaps
  • P2 (Medium): 10 placeholders
    • Non-compliant, needs work
  • P3 (Low): 8 placeholders
    • Compliant, maintenance only

Critical Issues

1. Known Code-Documentation Conflicts

  • weight_trend: Code uses 28d, docs say 7d/30d
    • Resolution: Update docs to match code (28d)
  • activity_summary: Code uses 14d, docs say 7d
    • Resolution: Update docs to match code (14d)
  • activity_detail: Time window unclear in code
    • Resolution: Needs code review to determine actual time window

2. High-Usage Placeholders (Breaking Change Risk)

  • name (19 uses, non_compliant)
  • geschlecht (14 uses, non_compliant)
  • height (12 uses, non_compliant)
  • weight_aktuell (10 uses, compliant)
  • weight_trend (10 uses, compliant)
  • goal_bf_pct (10 uses, non_compliant)
  • caliper_summary (8 uses, partially_compliant)
  • circ_summary (8 uses, compliant)
  • goal_weight (8 uses, non_compliant)
  • protein_ziel_low (7 uses, non_compliant)
  • protein_ziel_high (7 uses, non_compliant)
  • activity_detail (4 uses, non_compliant)

3. Missing Documentation (P0)

49 placeholders lack category classification 49 placeholders lack descriptions

Recommendations

Immediate Actions (P0)

  1. Resolve Known Conflicts (3 placeholders, 2-4 hours)

    • Update documentation to match code implementation
    • Validate time windows in code
  2. Classify Time Windows (74 placeholders, 8-12 hours)

    • Use name-based extraction for *_7d, *_28d patterns
    • Extract from code default parameters
    • Manual classification for unclear cases
  3. Add Categories and Descriptions (49 placeholders, 4-6 hours)

    • Bulk update from audit semantic analysis
    • Use existing audit report classifications

Next Sprint (P1)

  1. Add Confidence Logic (103 placeholders, 12-16 hours)

    • Implement for trend/delta placeholders
    • Add min-data thresholds
  2. Document Data Layer Modules (100 placeholders, 6-8 hours)

    • Trace resolver functions to data layer
    • Document source tables

Later (P2-P3)

  1. Integrate Unused Placeholders (67 placeholders)

    • Create prompt use cases
    • Plan integration timeline
  2. Achieve Production Status (30+ placeholders)

    • Reach 80%+ metadata completeness
    • Complete all normative requirements

Conclusion

The reconciliation process successfully analyzed all 111 placeholders. While only 8 are currently fully compliant, the systematic gaps are primarily documentation-related rather than functional. With a structured remediation plan (estimated 82-110 hours), the system can reach

60% normative conformity within 4-6 weeks.

Next Steps:

  1. Review this summary with product/tech leads
  2. Prioritize P0 items for immediate action
  3. Begin systematic remediation following the implementation waves