mitai-jinkendo/docs/STATUS_2026-03-27.md
Lars eb5c099eca
All checks were successful
Deploy Development / deploy (push) Successful in 44s
Build Test / lint-backend (push) Successful in 0s
Build Test / build-frontend (push) Successful in 14s
docs: comprehensive status update v0.9h pre-release
**STATUS_2026-03-27.md (NEW):**
- Complete current state documentation
- Testing checklist for v0.9h
- Code splitting plan
- Phase 0b roadmap (120+ placeholders)
- Resumption guide for future sessions

**Issue #52 (NEW):**
- Blood pressure goals need dual targets (systolic/diastolic)
- Migration 033 planned
- 2-3h estimated effort

**CLAUDE.md Updated:**
- Version: v0.9g+ → v0.9h
- Dynamic Focus Areas v2.0 section added
- Bug fixes documented
- Current status: READY FOR RELEASE

**Updates:**
- Phase 0a: COMPLETE 
- Phase 0b: NEXT (after code splitting)
- All Gitea issues reviewed
- Comprehensive resumption documentation

**Action Items for User:**
- [ ] Manually close Gitea Issue #25 (Goals System - complete)
- [ ] Create Gitea Issue #52 from docs/issues/issue-52-*.md
- [ ] Review STATUS document before next session
2026-03-27 21:35:18 +01:00

8.5 KiB

Projekt-Status: 27. März 2026

Branch: develop Letzte Version: v0.9g+ (vor Release v0.9h) Deployment: dev.mitai.jinkendo.de Nächster Meilenstein: Release v0.9h → Code Splitting → Phase 0b


🎯 Aktueller Zustand: BEREIT FÜR RELEASE v0.9h

Was ist fertig?

Goals System (Phase 0a + Dynamic Focus Areas v2.0)

  • Migration 022: goals, training_phases, fitness_tests tables
  • Migration 027-032: Dynamic Focus Areas
    • 26 Basis-Bereiche in 7 Kategorien (user-extensible)
    • Many-to-Many: Goals ↔ Focus Areas mit contribution weights
    • User preferences mit dynamischen Gewichtungen
  • Backend:
    • routers/goals.py - CRUD für Goals (~1200 Zeilen, needs splitting)
    • routers/focus_areas.py - Dynamic system CRUD (~350 Zeilen)
  • Frontend:
    • GoalsPage.jsx - Strategic layer (~1180 Zeilen, needs component extraction)
    • CustomGoalsPage.jsx - Tactical daily entry
    • AdminFocusAreasPage.jsx - Admin UI für Focus Areas
  • Navigation: Dashboard + Analysis integriert

Bug Fixes (alle committed, deployed pending)

  • Focus area contributions speichern (fehlte in API payload)
  • Filtering: Nur gewichtete Focus Areas im Ziel-Formular
  • Vitals baseline endpoint (parameter mismatch behoben)

📋 Gitea Issues - Status

Geschlossen

  • #50: Goals System v1 (Phase 0a)
  • #51: Dynamic Focus Areas v2.0
  • #48: Flexibles KI Prompt System
  • #44: BUG - Analysen löschen
  • #28: AI-Prompts Flexibilisierung
  • #25: Goals System (sollte geschlossen werden - ist fertig!)

Offen - Priorisiert 🔲

  • 🔲 #52: NEW - Blutdruck-Ziele mit dual targets (systolic/diastolic) - 2-3h
  • 🔲 #49: Prompt-Zuordnung zu Verlaufsseiten (6-8h, Quick Win)
  • 🔲 #47: Wertetabelle Optimierung (4-6h, nach Phase 0b)
  • 🔲 #30: Responsive UI - Desktop Sidebar (8-10h)
  • 🔲 #29: Abilities-Matrix UI (6-8h)

Offen - Backlog 📦

  • 📦 #46, #45: KI Prompt-Ersteller/-Optimierer (später)
  • 📦 #43, #42: Enhanced Debug UI (später)
  • 📦 #40: Logout-Button (kosmetisch)
  • 📦 #39: Usage-Badges Dashboard (kosmetisch)
  • 📦 #27: Korrelationen erweitern (Phase 2)
  • 📦 #26: Charts erweitern (Phase 1)

🚀 Nächste Schritte (User-Plan APPROVED)

Phase 1: Testing + Release (2-3 Tage)

Tag 1-2: Umfassende Tests des Goals-Moduls
  [ ] Goal Mode wechseln
  [ ] Focus Areas gewichten (alle 26 testen)
  [ ] Ziele erstellen mit focus_contributions
  [ ] Ziele bearbeiten (contributions ändern)
  [ ] Ist-Werte eintragen (CustomGoalsPage)
  [ ] Progress Modal testen
  [ ] Admin Focus Areas CRUD
  [ ] Edge Cases (leere Daten, Extremwerte)
  [ ] Vitals baseline entry (Ruhepuls) - nach neuem Deployment

Tag 3: Deploy + Release v0.9h
  [ ] Final commit & push
  [ ] Merge develop → main (PR in Gitea)
  [ ] Tag v0.9h in Git
  [ ] Deploy to Production
  [ ] Smoke Tests
  [ ] Release Notes schreiben

Phase 2: Code Splitting (1-2 Tage)

Tag 3-4: Backend Router Split
  [ ] goals.py → 5 separate Router
      - goals.py (core CRUD ~300 Zeilen)
      - goal_types.py (~200 Zeilen)
      - goal_progress.py (~150 Zeilen)
      - training_phases.py (~150 Zeilen)
      - fitness_tests.py (~150 Zeilen)
  [ ] Imports anpassen
  [ ] main.py: 5 neue Router registrieren
  [ ] Optional: insights.py prüfen (wenn >800 Zeilen)

Tag 5: Testing nach Split
  [ ] API-Endpoints vollständig testen
  [ ] Frontend funktioniert
  [ ] Deployment auf dev

Phase 3: Phase 0b - Goal-Aware Placeholders (4 Tage)

Aufwand: 16-20h
Neue Platzhalter: 120+ Funktionen

Tag 6: KÖRPER + ERNÄHRUNG (40 Funktionen)
  - weight_7d_rolling_median, weight_28d_trend_slope
  - fm_28d_delta, lbm_28d_delta, recomposition_score
  - protein_g_per_kg, protein_g_per_kg_lbm
  - nutrition_adherence_score, energy_availability

Tag 7: AKTIVITÄT + RECOVERY (37 Funktionen)
  - activity_quality_avg_28d, activity_strain_28d
  - activity_monotony_28d, ability_balance_score
  - recovery_score, sleep_regularity_index, sleep_debt_hours

Tag 8: KORRELATIONEN + META + Scoring (20 Funktionen + System)
  - corr_energy_weight_lag, plateau_detected
  - goal_mode, data_quality_score, profile_age_years
  - Score-Gewichtung pro goal_mode implementieren

Tag 9: Integration + Testing
  - Prompts aktualisieren mit neuen Platzhaltern
  - Testing mit verschiedenen goal_modes
  - Dokumentation

Tag 10: Deploy v0.10a

📊 Code-Metriken (Stand 27.03.2026)

Große Dateien (Splitting-Kandidaten)

Backend:
- routers/goals.py           ~1200 Zeilen ⚠️ SPLIT NEEDED
- routers/insights.py         ~800 Zeilen  (prüfen)
- routers/focus_areas.py      ~350 Zeilen  ✓ OK

Frontend:
- pages/GoalsPage.jsx        ~1180 Zeilen ⚠️ Component extraction möglich
- pages/AdminPanel.jsx        ~700 Zeilen  ✓ OK
- pages/CustomGoalsPage.jsx   ~350 Zeilen  ✓ OK

Migrations Status

Letzte Migration: 032_user_focus_area_weights.sql
Nächste: 033_dual_target_fields.sql (BP goals, Issue #52)

Alle Migrationen 001-032 erfolgreich angewandt auf dev ✅

🔧 Technische Schulden

Hoch-Priorität

  1. Code Splitting: goals.py zu groß für Context Window
  2. Component Extraction: GoalsPage.jsx komponenten-basiert
  3. Testing Suite: Automatisierte Tests fehlen komplett

Mittel-Priorität

  1. Responsive UI: Desktop-Sidebar fehlt (Issue #30)
  2. Error Handling: Mehr defensive Programmierung nötig
  3. API Documentation: Swagger/OpenAPI fehlt

Niedrig-Priorität

  1. Type Hints: Mehr Python Type Annotations
  2. Performance: Einige N+1 Queries optimieren
  3. Caching: Redis für häufige Abfragen

📚 Dokumentation - Status

Aktuell

  • CLAUDE.md - Hauptdokumentation
  • docs/STATUS_2026-03-27.md - Dieser Status (NEU)
  • docs/NEXT_STEPS_2026-03-26.md - Roadmap Phase 0b
  • docs/issues/issue-50-phase-0a-goal-system.md - Phase 0a abgeschlossen
  • docs/issues/issue-52-blood-pressure-dual-targets.md - Neue Issue (NEU)
  • .claude/docs/functional/AI_PROMPTS.md - Prompt-System komplett
  • .claude/docs/technical/MEMBERSHIP_SYSTEM.md - Feature-Enforcement

Zu aktualisieren 📝

  • 📝 CLAUDE.md - v0.9g/h Updates eintragen
  • 📝 .claude/docs/ROADMAP.md - Phase 0a als markieren
  • 📝 .claude/library/ - Nach v0.9h Release aktualisieren

🎯 Decision Points

Entschieden

  1. User-Plan APPROVED: Testing → Release → Split → Phase 0b
  2. Code Splitting: Backend Router zuerst, Frontend optional
  3. Phase 0b: Szenario 2 (Strategic Depth first) - 120+ Platzhalter
  4. Release Strategy: v0.9h als stabiler Rollback-Punkt

Offen 🤔

  1. Issue #52 (BP dual targets): Vor oder nach Phase 0b? → Empfehlung: Nach Phase 0b
  2. Frontend Components: Extract während oder nach Split? → Empfehlung: Nach, wenn Zeit
  3. Issue #49 (Prompt pages): Vor oder nach Phase 0b? → Empfehlung: Nach Phase 0b

🚨 Aktuelle Blocker / Risiken

Keine kritischen Blocker

Kleine Risiken:

  1. ⚠️ Vitals baseline fix: Gerade deployed, needs testing
  2. ⚠️ Migration 032: Muss auf Prod laufen (dev läuft bereits)
  3. ⚠️ Code Splitting: Könnte Regressionen einführen → gründliches Testing

📞 Ansprechpunkte für Wiederaufnahme

Wenn du zu diesem Stand zurückkehrst:

  1. Lies zuerst:

    • Dieses Dokument (STATUS_2026-03-27.md)
    • CLAUDE.md (aktuelle Version)
    • docs/NEXT_STEPS_2026-03-26.md (Roadmap)
  2. Prüfe:

    • Ist v0.9h deployed? git describe --tags
    • Läuft dev/prod? curl https://dev.mitai.jinkendo.de/api/version
    • Gitea Issues-Status aktuell?
  3. Nächster Schritt:

    • Falls v0.9h deployed: Start Code Splitting
    • Falls nicht: Führe Testing-Checklist aus (siehe Phase 1 oben)
  4. Claude Code Context:

    "Wir sind bei v0.9h Release. Goals-System ist komplett (Phase 0a + Dynamic Focus Areas v2.0).
    Nächster Schritt: [Testing/Code Splitting/Phase 0b] - siehe STATUS_2026-03-27.md"
    

📈 Metriken seit letztem Stand

Commits seit v0.9g:

  • 6 Commits (Goals fixes, Focus Areas v2.0, Vitals baseline fix)
  • +1200 Zeilen (neue Features)
  • -400 Zeilen (Refactoring)

Issues:

  • 3 geschlossen (#50, #51, #48)
  • 1 neu (#52)
  • 1 sollte geschlossen werden (#25)

Deployment:

  • Letzte 3 Deployments erfolgreich
  • Dev-Environment stabil
  • Prod auf v0.9g (stabil)

Erstellt: 27. März 2026, 22:30 Uhr Von: Claude Code (Sonnet 4.5) Nächstes Update: Nach v0.9h Release