Kairo-Jinkendo/docs/sprints/Sprint0_AP0_8_Completion_Report_v0.1.md
Lars fe3bc4f057
All checks were successful
Deploy Development / deploy (push) Successful in 45s
Test Suite / pytest-backend (push) Successful in 58s
Test Suite / lint-backend (push) Successful in 2s
Test Suite / compose-smoke (push) Has been skipped
Test Suite / k6 /api/health Baseline (push) Successful in 18s
Test Suite / playwright-smoke (push) Successful in 12s
AP0.8: Operating Model Extension I (Attention, Blocker, Backlog, Milestone)
Schema 007, regelbasierte Attention/NextAction im Data Layer, CRUD fuer Blocker/Backlog/Meilensteine, Workspace-Widget und Initiative-Detail-Sektionen. 25 Capabilities. Tests fuer Remote-Pytest auf Pi angepasst (conftest Session-Guard).

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-07-05 15:11:15 +02:00

4.6 KiB
Raw Permalink Blame History

AP0.8 Abschlussbericht Operating Model Extension I

Status: abgeschlossen (Implementierung) · QA mit DB ausstehend
Stand: 2026-07-05
Version: Backend/Frontend 0.8.0-ap0.8 · Schema 007
Auftrag: Sprint0_AP0_8_Assignment_v0.2.md (abgeglichen mit System Target State v0.1)


1. Scope und Einordnung

AP0.8 ist der erste fachliche Ausbau nach dem Product Reset. Er operationalisiert die Leitfrage über regelbasierte Attention/NextAction und erweitert das Domänenmodell um Blocker, BacklogItem und Milestone.

Einordnung in der Evolutionslinie (System Target State §24):

  • Foundation ✓ (AP0.7)
  • Signal / NextAction Engine — erste Instanz ✓ (AP0.8a, Data Layer)
  • Operating Model Phase A ✓ (Blocker, Backlog, Milestone)
  • SteeringContext / Method Registry — bewusst nicht in AP0.8

2. Definition of Done — Prüfmatrix

Kriterium Ergebnis Nachweis
Migration 007 007_operating_model_extension_i.sql
Attention Regeln 16 data_layer/attention.py
NextActionCandidates get_next_action_candidates
Blocker CRUD services/blockers.py, Router
Backlog CRUD + Convert services/backlog.py
Milestone CRUD services/milestones.py
AttentionWidget widgets/AttentionWidget.jsx
Initiative-Detail Sektionen Blockers/Backlog/Milestones
25 Capabilities operating_model_ops.py
Frontend Vitest + Build 9/9, build grün
Backend pytest Remote Gitea test.yml nach Push auf develop (Pi, Container)
Kein KI/MCP/Steering Scope eingehalten

3. Migration 007

Tabellen: blockers, backlog_items, milestones — alle mit tenant_id, FK RESTRICT/CASCADE wie AP0.5.


4. Attention / NextActionCandidate

  • Datei: backend/data_layer/attention.py
  • API: GET /api/workspace/attention, GET /api/workspace/next-actions
  • Regeln: blocked_action, open_blocker, high_priority (personal), unassigned, initiative_without_next_action, stale_initiative, milestone_at_risk
  • DTOs mit reason_code, scope_type, data_source (Erklärbarkeit gemäß System Target State §17)

5. Blocker

  • Service + nested/flat API
  • Audit: blocker.created/updated/status_changed/deleted
  • Optional: set_action_blocked bei Create

6. BacklogItem

  • Getrennt von Actions (RoadmapItem/Backlog/Action-Unterscheidung)
  • Convert-to-action mit Audit backlog.converted_to_action

7. Milestone minimal

  • MVP-Brücke (langfristig RoadmapItem — AD-TA-08)
  • Attention-Regel 6 für at_risk

8. Data Layer Erweiterung

Neu: attention.py — Read-only, tenant-scoped, keine Router-SQL.


9. API-Endpunkte

Siehe README AP0.8-Tabelle.


10. Capabilities

7 neue: kairo.attention.read, kairo.blocker.*, kairo.backlog.*, kairo.milestone.*
Gesamt: 25


11. Frontend-Integration

  • AttentionWidget (order 8, capability kairo.attention.read)
  • BlockersSection, BacklogSection, MilestonesSection im Vorhaben-Detail
  • Status-Badges erweitert für blocker/backlog/milestone

12. Tests und Verifikation

Test Status
test_ap08_operating_model.py 14 Tests — Lauf auf Pi via test.yml
test_rights_registry.py aktualisiert (25 Capabilities)
test_migrations.py Migration 007 ergänzt
conftest.py Session-Guard: skip lokal ohne DB, kein Migrations-Timeout
Vitest 9/9 grün (lokal)
vite build grün (lokal)

Verifikation: Push auf developdeploy-dev.yml + test.yml (pytest im Backend-Container gegen PostgreSQL im Compose-Stack).


13. Abweichungen von diesem Auftrag

Punkt Abweichung
Auftrag v0.1 Ersetzt durch v0.2 nach Abgleich System Target State
Attention DTO Zusätzlich scope_type, data_source, Regel 1b open_blocker
NextAction DTO Explizit dokumentiert und implementiert
Milestone API target_date Router akzeptiert ISO-Date-String

Keine fachlichen Scope-Abweichungen.


14. Offene Punkte für AP0.9

  • Evidence, Decision, Review, RecurringElement
  • Action-Status ready, review_required
  • Due Dates auf Actions + Attention Regeln 79
  • Attention-Refactor in backend/steering/signals/ (wenn Steering Core startet)

15. Empfehlung für AP0.10 / Validation

Nach AP0.9 ein reales Testvorhaben durchspielen (Backlog → Action → Blocker → Meilenstein → Attention). Milestone→RoadmapItem-Konsolidierung als ADP vor Phase C klären.


Implementierung abgeschlossen — Backend-pytest und Smoke auf dem Pi nach Push auf develop.