feat(P-11): Implement Legal Hold functionality for media assets
Deploy Development / deploy (push) Successful in 40s
Test Suite / pytest-backend (push) Successful in 34s
Test Suite / lint-backend (push) Successful in 0s
Test Suite / build-frontend (push) Successful in 10s
Test Suite / playwright-tests (push) Successful in 54s
Deploy Development / deploy (push) Successful in 40s
Test Suite / pytest-backend (push) Successful in 34s
Test Suite / lint-backend (push) Successful in 0s
Test Suite / build-frontend (push) Successful in 10s
Test Suite / playwright-tests (push) Successful in 54s
- Added backend support for Legal Hold with new endpoints to set and release holds on media assets. - Introduced new database columns for managing Legal Hold status and reasons. - Updated frontend to include UI elements for setting and releasing Legal Holds, including a confirmation dialog. - Enhanced Media Library page to display Legal Hold status and actions for superadmins. - Implemented comprehensive backend tests covering all aspects of Legal Hold functionality. - Updated documentation to reflect changes in the upload rights specification and interface models. - Bumped version to 0.8.84 and updated MediaLibraryPage version to 1.6.0.
This commit is contained in:
1 parent
1640fe6045
commit
1ce6d929ce
16 files changed
+1180
-42
No files matched your search
+14
-14
@@ -56,12 +56,12 @@ Diese Roadmap ist nach jedem Re-Audit zu aktualisieren. Abweichungen von der bis
|
||||
| P-01c+ | _Erweiterung:_ Als-Entwurf-kopieren (`copy-as-draft`) | 0.8.72 |
|
||||
| P-01c++ | _Erweiterung:_ Echter PDF-Download (jsPDF) + Abschnitts-Sortierung/-Einfügen | 0.8.74 |
|
||||
|
||||
**Vollständig abgeschlossen:** 7 Hauptpakete + 4 Nacharbeiten + 2 Erweiterungen = 13 Umsetzungseinheiten
|
||||
**Vollständig abgeschlossen:** 8 Hauptpakete + 4 Nacharbeiten + 2 Erweiterungen = 14 Umsetzungseinheiten
|
||||
**Teilweise umgesetzt (technisch):** P-01, P-06
|
||||
|
||||
### Offene Pakete (15)
|
||||
### Offene Pakete (14)
|
||||
|
||||
P-02, P-08, P-09, P-10, P-11, P-13, P-14, P-15, P-16, P-17, P-18, P-19, P-20, P-21, P-22
|
||||
P-02, P-08, P-09, P-10, P-13, P-14, P-15, P-16, P-17, P-18, P-19, P-20, P-21, P-22
|
||||
|
||||
### Gesamtstatus
|
||||
|
||||
@@ -73,7 +73,7 @@ P-02, P-08, P-09, P-10, P-11, P-13, P-14, P-15, P-16, P-17, P-18, P-19, P-20, P-
|
||||
2. **P-06:** Keine Einwilligungserklärung beim Medienupload. Personenbilder können ohne jede Rechteabklärung hochgeladen werden.
|
||||
3. **P-02:** Nutzer können ihr Konto nicht selbst löschen (DSGVO Art. 17). Der Prozess ist noch nicht einmal fachlich spezifiziert.
|
||||
4. **P-13:** Keine Möglichkeit, rechtswidrige Inhalte zu melden. Bei einer UGC-Plattform mit öffentlichen Inhalten ist dies ein erhebliches Restrisiko, unabhängig davon, ob der DSA formal anwendbar ist.
|
||||
5. **P-11:** Kein Legal-Hold-Status. Bei erkannten Rechtsverletzungen dauert es bis zu 30 Tage, bis Inhalte vollständig ausgeblendet sind.
|
||||
5. ~~**P-11:** Kein Legal-Hold-Status.~~ ✅ **Implementiert (v0.8.84).**
|
||||
|
||||
**Was geöffnet bleiben kann (mit Dokumentation):** Vereinsinterne Nutzung durch bekannte Trainer-Gruppen ist mit dem aktuellen Stand vertretbar, solange keine öffentliche Vermarktung stattfindet und kein `official`-Content aktiviert wird.
|
||||
|
||||
@@ -107,18 +107,17 @@ Die folgenden Pakete sind vor der Freigabe für allgemeine öffentliche Registri
|
||||
**Warum noch KRIT-04 offen:** Juristische Validierung der Einwilligungsformulierungen (§7.7), KUG-Anforderungen im Vereinskontext (§7.2), Minderjährigenschutz (§7.4) und Altbestand-Behandlung (§7.8) steht aus. Texte sind Arbeitsfassungen (`p06-v1-conservative`) ohne anwaltliche Freigabe.
|
||||
**Nächster Schritt:** Rechtsanwalt für juristische Prüfung der Feldtexte (T1–T10 in `docs/p06-upload-rights-spec.md` §10.3) und der offenen KUG/DSGVO-Fragen beauftragen. Nach Klärung: Textfreigabe eintragen → KRIT-04 kann geschlossen werden.
|
||||
|
||||
### Blocker 3 — P-11: Legal-Hold Lifecycle-Status
|
||||
### ~~Blocker 3 — P-11: Legal-Hold Lifecycle-Status~~ ✅ Implementiert (v0.8.84)
|
||||
|
||||
**Finding:** MITT-02
|
||||
**Warum jetzt statt Etappe 2:** Der aktuelle Papierkorb-Mechanismus reicht für reaktive Maßnahmen bei Rechtsverletzungen nicht aus. Zwischen Meldung und vollständiger Unsichtbarkeit liegen bis zu 30 Tage (Stufe 1). Für eine Plattform mit öffentlichen Inhalten ist das nicht akzeptabel.
|
||||
**Abhängigkeit:** Sinnvoll mit P-13 zusammen umzusetzen (Moderationssystem braucht direkten Sperr-Status).
|
||||
**Abgeschlossen:** 2026-05-11. Migration 051, `media_legal_hold.py`, Retention-Schutz, Superadmin-API + Frontend. Details: `docs/compliance-package-register.md` §P-11.
|
||||
|
||||
### Blocker 4 — P-13: Content-Melde-Backend (Minimalversion)
|
||||
### Blocker 3 (neu) — P-13: Content-Melde-Backend (Minimalversion)
|
||||
|
||||
**Finding:** KRIT-03
|
||||
**Warum vorgezogen (Abweichung vom Initial-Audit):** → Siehe §4
|
||||
**Minimalumfang:** Meldung einreichen + Moderations-Queue für Admin. Nicht der volle P-14–P-16-Stack.
|
||||
**Abhängigkeit:** P-11 (Legal-Hold) für direkte Reaktion auf Meldungen empfohlen.
|
||||
**Abhängigkeit:** ~~P-11 (Legal-Hold)~~ ✅ bereits implementiert.
|
||||
|
||||
### Blocker 5 — P-02: DSGVO-Self-Service (fachliche Spezifikation zuerst)
|
||||
|
||||
@@ -176,8 +175,8 @@ Reihenfolge innerhalb der Etappe ist flexibel; P-01 und P-06 haben keine gegense
|
||||
|-------|-------|---------|-------------|----------------------|
|
||||
| P-01 | Rechtstexte technisch anlegen (Platzhalter-Seiten, Routen) | 2–4 h Technik | Inhalt durch Rechtsanwalt separat | „Freigabe zur Umsetzung P-01: Rechtstexte" |
|
||||
| P-06 | Upload-Einwilligungsdialog | 2–4 Tage | — | „Freigabe zur Umsetzung P-06: Upload-Einwilligungsdialog" |
|
||||
| P-11 | Legal-Hold Lifecycle-Status | 2–3 Tage | sinnvoll vor P-13 | „Freigabe zur Umsetzung P-11: Legal-Hold Lifecycle-Status" |
|
||||
| P-13 | Content-Melde-Backend (Minimalversion) | 3–5 Tage | P-11 empfohlen | „Freigabe zur Umsetzung P-13: Content-Melde-Backend" |
|
||||
| ~~P-11~~ | ~~Legal-Hold Lifecycle-Status~~ | — | ✅ implementiert (v0.8.84) | — |
|
||||
| P-13 | Content-Melde-Backend (Minimalversion) | 3–5 Tage | P-11 ✅ bereits erfüllt | „Freigabe zur Umsetzung P-13: Content-Melde-Backend" |
|
||||
|
||||
**Hinweis P-01:** Die technische Anlage (leere Seiten, Routen `/impressum`, `/datenschutz`, `/nutzungsbedingungen`) ist von der juristischen Ausarbeitung des Inhalts zu trennen. Beide Teilschritte können unabhängig voneinander freigegeben und durchgeführt werden.
|
||||
|
||||
@@ -259,7 +258,7 @@ Folgende Bedingungen müssen **alle** erfüllt sein:
|
||||
| Impressum und Datenschutzerklärung mit juristisch geprüftem Inhalt | P-01 | ⚠️ Routen vorhanden — Inhalte durch Rechtsanwalt erforderlich |
|
||||
| Upload-Einwilligungsdialog aktiv | P-06 | Code |
|
||||
| DSGVO-Löschprozess spezifiziert (Spec akzeptiert, auch wenn nicht vollständig implementiert) | P-02 | Spezifikation |
|
||||
| Legal-Hold-Status vorhanden | P-11 | Code |
|
||||
| Legal-Hold-Status vorhanden | P-11 | ✅ Bereits erfüllt (Version 0.8.84) |
|
||||
| Content-Melde-Backend (Minimalversion) aktiv | P-13 | Code |
|
||||
| HSTS am externen Reverse-Proxy nachgewiesen | P-08 | Betreiber |
|
||||
| Papierkorb-Retention-Job läuft (Monitoring aktiv) | P-03 | Bereits erfüllt |
|
||||
@@ -284,7 +283,7 @@ Bevor Inhalte mit `official`-Sichtbarkeit (plattformweit sichtbar, ohne Login) a
|
||||
|-----------|-------|-----|
|
||||
| Gate 1 vollständig erfüllt | — | Voraussetzung |
|
||||
| Upload-Einwilligungsdialog für Personenbilder aktiv | P-06 | Code |
|
||||
| Legal-Hold-Status aktiv (Sofortsperrung möglich) | P-11 | Code |
|
||||
| Legal-Hold-Status aktiv (Sofortsperrung möglich) | P-11 | ✅ Bereits erfüllt (Version 0.8.84) |
|
||||
| Content-Melde-Backend aktiv | P-13 | Code |
|
||||
| Copyright-Pflicht bei Promotion aktiv und getestet | P-04 | Bereits erfüllt |
|
||||
| Moderationsprozess organisatorisch dokumentiert (wer, wie schnell, Eskalationspfad) | — | Betreiber |
|
||||
@@ -362,7 +361,8 @@ Diese Punkte liegen außerhalb des Code-Scopes und erfordern organisatorische Ma
|
||||
| ~~P-01b~~ | ~~„Freigabe zur Umsetzung P-01b: Mobile/PWA-Zugriff auf Rechtliches"~~ | ✅ historisch abgeschlossen (Version 0.8.70) |
|
||||
| ~~P-01c~~ | ~~„Freigabe zur Umsetzung P-01c: Admin-konfigurierbare Rechtstexte"~~ | ✅ historisch abgeschlossen (Version 0.8.71); Erweiterungen copy-as-draft (0.8.72) + jsPDF/Sortierung (0.8.74) |
|
||||
| **P-06** | **„Freigabe zur Umsetzung P-06 auf Basis konservativer Erstannahmen"** | ✅ erteilt + vollständig umgesetzt (2026-05-11, v0.8.75–0.8.83) — technisch umgesetzt unter `p06-v1-conservative` inkl. P-06+ Volljournal + Korrektur; KRIT-04 bleibt bis juristische Validierung |
|
||||
| Etappe B komplett | „Freigabe zur Umsetzung Etappe B: P-11, P-13" | ⬅ nächste empfohlene Freigabe (nach juristischer Klärung P-06/KRIT-04 und Rechtstexten P-01) |
|
||||
| **P-11** | **„Freigabe zur Umsetzung P-11: Legal-Hold Lifecycle-Status"** | ✅ vollständig umgesetzt (2026-05-11, v0.8.84) — Migration 051, Retention-Schutz, Superadmin-API + Frontend; 15 Backend-Tests |
|
||||
| P-13 | „Freigabe zur Umsetzung P-13: Content-Melde-Backend" | ⬅ nächste empfohlene Freigabe (nach juristischer Klärung P-06/KRIT-04 und Rechtstexten P-01) |
|
||||
| P-02 Spezifikation | „Freigabe zur Spezifikation P-02: DSGVO-Self-Service-Prozess" | offen |
|
||||
|
||||
---
|
||||
|
||||
Reference in new issue
Block a user