Kairo-Jinkendo/docs
Lars 075cff00a2
Some checks failed
Test Suite / lint-backend (push) Waiting to run
Test Suite / compose-smoke (push) Waiting to run
Test Suite / k6 /api/health Baseline (push) Blocked by required conditions
Test Suite / playwright-smoke (push) Blocked by required conditions
Deploy Development / deploy (push) Successful in 45s
Test Suite / pytest-backend (push) Has been cancelled
Docs: Zielzustands-Graph ist kein Workflow; Plan vs. Ist.
Plan-Mode-Design und ADP praezisieren Graph-Semantik, MVP-Zwischenstand und vorgeschlagene Pakete AP1.14/15 fuer Plan-Ist-Parallelitaet und Modellierungswerkzeug.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-07-11 07:42:14 +02:00
..
architecture Docs: Zielzustands-Graph ist kein Workflow; Plan vs. Ist. 2026-07-11 07:42:14 +02:00
product Docs: Zielzustands-Graph ist kein Workflow; Plan vs. Ist. 2026-07-11 07:42:14 +02:00
reference/design-principles Sprint-0-Grundlagen: Spec-Handover, Designprinzipien-Referenz, Medien optional. 2026-07-04 19:03:57 +02:00
sprints AP2.0: Archetyp-Katalog, Method-Stubs und sichtbare Steuerung in Kontrolle. 2026-07-10 10:44:38 +02:00
DEPLOYMENT.md AP0.3 Abschlussbericht v0.3: Prod-Deploy-Nacharbeit und DB-Passwort-Doku. 2026-07-04 23:11:26 +02:00
MIGRATIONS.md Doku AP0.5: ADP Scope-Verschiebung, MIGRATIONS 006, Abschlussbericht v0.2. 2026-07-05 06:23:24 +02:00